As promised, today LUXE BLOG Arizona Real Estate Market Update features the rest of the latest construction images taken from inside the construction site of the Ritz-Carlton, Paradise Valley Resort (by Aaron Auxier on May, 25 2021).
We’ll let the images descriptions do most the talking. Enjoy!
Grand Entrance & Lobby | Ritz-Carlton, Paradise Valley
Stairs to Grand Lobby | Construction Image Update
Main 3-Meal Restaurant & Pool
Spa & Hydrotherapy | Ritz-Carlton, Paradise Valley AZ
Amphitheater, Ritz-Carlton PV | Construction Images
Mezzanine Level Area
…construction images (in order) of Ritz-Carlton, Paradise Valley’s:
Main Fitness Center – Ritz-Carlton Resort
Main Pool From Outdoor Lobby Patio
Hotel Room Corridor Posted 6/1/21
Gypsum Board Installed In Hotel Room
Taking the latest images and videos from the massive construction site is something we at WLH plan on continuing. Don’t forget to check out our past Ritz-Carlton, Paradise Valley Construction Image Updates (which began at said link in Dec. 2020).
We’ve been seeing some of our photos showing up on resort construction enthusiast forums/boards (something we love to see). If anyone has any particular image/video requests just send us an email at our contact form.
Approx. 10k Sq. Ft. Ballroom
Subterranean Parking Garage Construction
Hydrotherapy Spa Area Suites